Superconducting cables at the Vouillé sidings

World first: reinforcing the power supply of stabling sidings with a superconducting cable.

World firstin a railway application
×10power in the same footprint
5.3 MWper cable
−200 °Coperating temperature
2022–2026Period

The assignment

World first: reinforcing the power supply of stabling sidings with a superconducting cable.

The challenge

To reinforce the power supply of the Vouillé stabling sidings, SNCF lacks the space, in town and on railway land, to lay conventional copper cables. The alternative: a superconducting cable able to carry very high currents in a small footprint.

Our approach

TRACTEDIS is involved from contract award to acceptance support: approval of construction studies (EALE assembly book, agent E cabinet, controlled negative frame, cable book), site supervision, test procedures and test books, then phase 2.1 on-site tests: visual and document checks, cable continuity, insulation of equipment and cables, interlocking checks.

Project owner
SNCF Réseau
Engineer
SNCF / TRACTEDIS
Contractor
SFEE
TRACTEDIS role
Owner's and designer's assistance, on-site verification testing
Assignment
Engineering & supervision, Testing & commissioning
System and voltage
1,500 V DC
Country
France
Period
2022–2026
Certificate
On request