Villeneuve Demain rolling stock depot

Upgrade of the Villeneuve Prairie depot to host the new RER D and Line R trains.

3dual-voltage workshops 1,500 V / 25 kV
2 000 kVA20/25 kV test substation
230weekly movements
€685mtotal investment
2018–2027Period

The assignment

Upgrade of the Villeneuve Prairie depot to host the new RER D and Line R trains.

The challenge

The upgrade of the Villeneuve Prairie depot allows it to host and maintain the new RER D and Transilien Line R trains, rolled out gradually to improve travel for 700,000 daily passengers.

Our approach

Detailed design (PRO): traction simulations (impact of train movements on the power supply), HV/LV architecture, control-command and automation design. External review of construction studies: technical and regulatory compliance, consistency of interfaces and construction documents, approval follow-up.

Project owner
SNCF
Engineer
VITEO (conception-réalisation)
Contrôle externe
Artelia
Contractor
VITEO
TRACTEDIS role
Detailed design and external review of the EALE construction studies
Assignment
Design, Engineering & supervision
System and voltage
1,500 V DC / 25 kV
Country
France
Period
2018–2027
Certificate
On request

A similar project? Let’s talk

A fast answer from the office closest to your project.