Grids & Industry · France
63 kV substation for a data centre, Villefontaine
63 kV substation connecting a data centre of about 60 MW in Isère to the transmission grid.
63 kVtransmission connection
60 MWsite demand
2025–2026Period
The assignment
63 kV substation connecting a data centre of about 60 MW in Isère to the transmission grid.
The challenge
A high-power data centre must be connected to the transmission grid in line with RTE's connection offer, on a constrained plot.
Our approach
Preliminary design of the 63 kV substation: single-line diagrams, calculations, power balance, technical specifications, specification document, layouts, estimate and schedule, then support at construction stage.