Grids & Industry · France

Landes Girondines 400/225 kV substation

New 400/225 kV substation, a key link in connecting the region's renewables to the transmission grid.

400 kVhighest voltage
€15mproject cost
2025–2029schedule
2025–2029Period

The assignment

New 400/225 kV substation, a key link in connecting the region's renewables to the transmission grid.

The challenge

The substation must connect the south-west's growing renewable generation to the transmission grid.

Our approach

Infrastructure and HV superstructure design, earthing grid, control and telecoms, sizing and layout of units, utility connections, civil works integration, procurement, cost estimate, management and coordination of studies.

Project owner
RTE
Engineer
TRACTEDIS / SCE / Setec
TRACTEDIS role
Full engineering, core technical studies
Assignment
Design, Engineering & supervision
System and voltage
400 / 225 kV
Country
France
Period
2025–2029
Certificate
On request