Le Mans tramway: capacity increase

Adaptation of the Glonnières substation and the depot for trams lengthened from 32 to 44 m.

32 → 44 mtram length
€55mproject cost
2024–2025Period

The assignment

Adaptation of the Glonnières substation and the depot for trams lengthened from 32 to 44 m.

The challenge

Lengthening line 1 trams requires adapting infrastructure and systems, including traction power.

Our approach

HV/LV design (layouts, calculations, selectivity and protection settings, panel diagrams), traction design (equipment specifications, traction cables, I/O, control), factory acceptance and functional, interface and commissioning tests.

Project owner
Cénovia
Engineer
SCE
Contractor
Bouygues Energies & Services
TRACTEDIS role
Construction design and testing, subcontractor to Bouygues E&S
Assignment
Design, Testing & commissioning
System and voltage
750 V DC / MV
Country
France
Period
2024–2025
Certificate
On request