Le Mans tramway: capacity increase
Adaptation of the Glonnières substation and the depot for trams lengthened from 32 to 44 m.
32 → 44 mtram length
€55mproject cost
2024–2025Period
The assignment
Adaptation of the Glonnières substation and the depot for trams lengthened from 32 to 44 m.
The challenge
Lengthening line 1 trams requires adapting infrastructure and systems, including traction power.
Our approach
HV/LV design (layouts, calculations, selectivity and protection settings, panel diagrams), traction design (equipment specifications, traction cables, I/O, control), factory acceptance and functional, interface and commissioning tests.