Transport · Senegal
Dakar regional express train
55 km line between Dakar and Blaise Diagne airport: traction power and station power systems.
55 kmof track
14stations
225 kVsubstation
4AT posts
2016–2020Period
The assignment
55 km line between Dakar and Blaise Diagne airport: traction power and station power systems.
The challenge
A flagship of the Emerging Senegal Plan, the line links Dakar to the new international airport in 45 minutes, with 14 stations, one substation and 4 autotransformer posts.
Our approach
Traction: review of studies and procedures for the substation, 4 AT posts and trackside remote-control posts. Power systems: electrical distribution of the 13 stations and halts and road crossings.