Grids & Industry · France

Lyon–Turin base tunnel: auxiliary power supply

Preliminary design of the power network feeding the auxiliary systems of the France–Italy base tunnel.

363 kV substations
8520 kV / 400 V substations
20 kmof MV cable
2024–2025Period

The assignment

Preliminary design of the power network feeding the auxiliary systems of the France–Italy base tunnel.

The challenge

For the design-and-build bid, an HV network of 3 63 kV substations, 85 20 kV/400 V substations and over 20 km of MV cables had to be designed.

Our approach

HV/MV/LV substations, supply architectures, HV/LV calculations, earthing grid, building management and supervision, single-line diagrams, layouts, specifications, power balance and quantities, with multi-discipline coordination and pricing.

Project owner
Tunnel Euralpin Lyon Turin
Engineer
Setec Ferroviaire
Groupement
Eiffage – Setec
TRACTEDIS role
Preliminary design of HV/LV installations and building management
Assignment
Design
System and voltage
63 kV / 20 kV
Country
France
Period
2024–2025
Certificate
On request