Transport · France

T13 tram-train, maintenance and stabling depot

Testing and commissioning of the power installations of the T13 tram-train depot.

2.5 MW750 V DC substation
18.8 kmof line
2019–2021Period

The assignment

Testing and commissioning of the power installations of the T13 tram-train depot.

The challenge

The T13 links Saint-Cyr-l'École and Saint-Germain-en-Laye over 18.8 km. Its depot houses the line control centre, a 750 V DC test substation and a 25 kV national-network connection.

Our approach

Equipment checks, current and voltage injection to test protection, remote control and automation checks, EALE commissioning, catenary continuity and insulation testing and coordination of dynamic tests with Safe Rail.

Project owner
SNCF Voyageurs
Engineer
SNCF Réseau
Contractor
SFEE
Essais
Egis / Safe Rail / TRACTEDIS
TRACTEDIS role
EALE integration and dynamic testing
Assignment
Testing & commissioning
System and voltage
750 V DC / 25 kV
Country
France
Period
2019–2021
Certificate
On request