Transport · France
T12 tram-train, electrical operation of the Massy depot
Lock-outs, electrical operation and energisation of the 1,500 V installations of the T12 depot.
1,500 V DCfrom the national network
4sidings energised
2021–2022Period
The assignment
Lock-outs, electrical operation and energisation of the 1,500 V installations of the T12 depot.
The challenge
Part of the site is in operation while civil works continue around it: people and equipment must be protected against any unexpected re-energisation.
Our approach
Electrical operation, full lock-outs (isolation, locking, identification, absence-of-voltage check, earthing and short-circuiting), energisation of the 1,500 V sidings and coordination of dynamic tests with Safe Rail.