3,200 V traction substations and 20 kV supply points
New 20 kV / 3,200 V substations at Mitry, Aulnay, Saint-Denis and Les Fruitiers.
The assignment
New 20 kV / 3,200 V substations at Mitry, Aulnay, Saint-Denis and Les Fruitiers.
The challenge
The project creates five 20 kV / 3,200 V substations supplying the electrified line equipment of the 3,200 V sections. It is split into two packages, electrical and general works: civil works and buildings, supply and installation of HV/LV equipment (transformers, HV switchgear…), HV and LV cables, earthing and connection.
Our approach
TRACTEDIS carries out all tender-stage design of the electrical package: specifications (CCTP), works cost estimate, HV/LV sizing calculations, single-line diagrams, power balance, works phasing and schedule. At contract award stage, TRACTEDIS scores the bids technically, attends the shortlisted contractors' presentations and scores the BAFOs.
- Project owner
- SNCF Réseau
- Engineer
- TRACTEDIS
- Contractor
- Bouygues Energies & Services
- TRACTEDIS role
- Design engineering: tender documents for the electrical package and contract award assistance
- Assignment
- Design, Engineering & supervision
- System and voltage
- 20 kV / 3 200 V
- Country
- France
- Period
- 2023–2024
- Certificate
- On request