Grids & Industry · France

Pierrette 225 kV substation extension

225 kV substation extension to connect an industrial site, under RTE's pilot contract for outsourced engineering.

225 kVextended substation
26 monthsassignment
2024–2026Period

The assignment

225 kV substation extension to connect an industrial site, under RTE's pilot contract for outsourced engineering.

The challenge

This pilot contract paves the way for RTE's outsourced substation engineering framework: the consortium carries the full engineering scope, from design to acceptance.

Our approach

Project management (interfaces, control and asbestos framework contracts, permits, procurement, contract award, planning), design (management and checking, civil works, lock-out scenarios, tender, equipment requirements, estimates) and works (supervision, tests, acceptance).

Project owner
RTE
Engineer
TRACTEDIS / SCE / Setec
Contractor
Elo Energy
Client
Kuhlmann France (client industriel raccordé)
TRACTEDIS role
Full engineering: preliminary to acceptance
Assignment
Design, Engineering & supervision
System and voltage
225 kV
Country
France
Period
2024–2026
Certificate
On request