Transport · France
20 kV supply substations at Mitry, Aulnay and Saint-Denis
Three 20 kV supply substations feeding the 3,200 V substations, from design to acceptance.
320 kV substations
2 000 kVAcontracted per substation
14 monthsof works
2022–2024Period
The assignment
Three 20 kV supply substations feeding the 3,200 V substations, from design to acceptance.
The challenge
Build three fully equipped 20 kV supply substations, civil works included, at Aulnay, Saint-Denis and Mitry, with HV and LV cables, earthing and connection.
Our approach
Full tender package (specifications, estimate, HV/LV calculations, drawings, single-line diagrams, power balance, schedule) and Enedis connection request; bid and BAFO scoring; then approval of construction studies, site supervision, hold-point release (factory acceptance, excavation, delivery, earth measurements) and method statement approval.