
Transport · Kenya
Nairobi Commuter Rail Network
Electrical feasibility studies for the Nairobi commuter rail network (8 lines), electrified at 25 kV 50 Hz.
Photo : Nairobi123, CC BY-SA 4.0, via Wikimedia Commons
8Lines studied
25 kV 50 HzElectrification
2026–Period
The assignment
Electrical feasibility studies for the Nairobi commuter rail network (8 lines), electrified at 25 kV 50 Hz.
The challenge
Nairobi's commuter network is to be electrified at 25 kV 50 Hz across several lines, starting from drawings, profiles and specifications, without an existing digital model.
Our approach
TRACTEDIS builds the network model, pre-sizes the traction supply with its in-house tools, then runs the simulations in SIGNON (ELBAS) to size the substations.
- Client
- Public owner, with SYSTRA
- TRACTEDIS role
- Electrification design and traction power simulations
- Assignment
- Design
- System and voltage
- 25 kV 50 Hz
- Country
- Kenya
- Period
- 2026–
- Certificate
- On request
Similar projects
A similar project? Let’s talk
A fast answer from the office closest to your project.

