Nairobi Commuter Rail Network

Electrical feasibility studies for the Nairobi commuter rail network (8 lines), electrified at 25 kV 50 Hz.

Photo : Nairobi123, CC BY-SA 4.0, via Wikimedia Commons

8Lines studied
25 kV 50 HzElectrification
2026–Period

The assignment

Electrical feasibility studies for the Nairobi commuter rail network (8 lines), electrified at 25 kV 50 Hz.

The challenge

Nairobi's commuter network is to be electrified at 25 kV 50 Hz across several lines, starting from drawings, profiles and specifications, without an existing digital model.

Our approach

TRACTEDIS builds the network model, pre-sizes the traction supply with its in-house tools, then runs the simulations in SIGNON (ELBAS) to size the substations.

Client
Public owner, with SYSTRA
TRACTEDIS role
Electrification design and traction power simulations
Assignment
Design
System and voltage
25 kV 50 Hz
Country
Kenya
Period
2026–
Certificate
On request