Transport · France

Marseille Blancarde depot

Return to service and upgrade of the depot's 25 kV substation, out of service since 2016, to supply two workshops again.

500 kVArating
5switchable tracks 1.5 / 25 kV
400 mof 20 kV cable
1emergency trip loop
2025–2027Period

The assignment

Return to service and upgrade of the depot's 25 kV substation, out of service since 2016, to supply two workshops again.

The challenge

After a fault on the site's 25 kV coaxial supply cable, SNCF Voyageurs needs to test its trains at 25 kV. The existing 25 kV substation has been out of service since 2016: it must be brought back into service and up to standard to supply two workshops at 25 kV from the site's internal 20 kV loop.

Our approach

TRACTEDIS carries out the preliminary design and drafts the EALE tender documents: specification, cable routing plan, layout plan, technical specification list, substation single-line diagrams, power balance, HV and LV calculations.

Project owner
SNCF Voyageurs
Engineer
Fer-Play / TRACTEDIS
TRACTEDIS role
Engineering: preliminary then detailed design and tender of the 25 kV substation
Assignment
Design, Engineering & supervision
System and voltage
25 kV / 20 kV
Country
France
Period
2025–2027
Certificate
On request