Mantes-la-Jolie town hall car park

Compliance upgrade of the HV substation and generator of a 301-space public car park.

301spaces
€440kproject cost
2025Period

The assignment

Compliance upgrade of the HV substation and generator of a 301-space public car park.

The challenge

The car park, on eight split levels, has a category A fire safety system: its HV substation and generator had to be brought into compliance without interrupting operation.

Our approach

Surveys, layouts, HV, LV and earthing calculations, panel diagrams, power balance, synoptics, datasheets, as-built drawings and handover file.

Project owner
Grand Paris Seine & Oise
Engineer
BT Consultant
Contractor
ETT Transport
TRACTEDIS role
Construction design, subcontractor to the contractor
Assignment
Design
System and voltage
MV / LV
Country
France
Period
2025
Certificate
On request