
La Mure railway
Sizing of the rail-to-rail bonding cables of the heritage line between La Mure and the Grand Balcon.
The assignment
Sizing of the rail-to-rail bonding cables of the heritage line between La Mure and the Grand Balcon.
The challenge
The La Mure railway was the world's first electrified line, opened in 1888. After a rockfall in October 2010 and eleven years of closure, it reopened in summer 2021. Once a mining railway carrying anthracite from the Matheysin plateau towards Grenoble, it is now a tourist attraction.
Our approach
TRACTEDIS sizes the rail-to-rail bonding cables. The minimum cross-section must meet three conditions: withstand the short-circuit current without exceeding the insulation's maximum temperature, carry the permanent mean current, and carry the maximum instantaneous current. Sizing is based on the most demanding operating case for the electrical system.
- Project owner
- Département de l'Isère
- Client
- Edeis
- TRACTEDIS role
- Sizing studies
- Assignment
- Design
- System and voltage
- cc
- Country
- France
- Period
- 2021
- Certificate
- On request
Similar projects
A similar project? Let’s talk
A fast answer from the office closest to your project.

