Transport · France
Grand Paris Express: temporary operation of line 18
Lock-outs, work permits and train movements during the temporary operation of line 18.
19 kmof line
7stations
17structures
1,500workers
2025–2027Period
The assignment
Lock-outs, work permits and train movements during the temporary operation of line 18.
The challenge
Between Christ de Saclay, Massy-Palaiseau and Orly airport, the line enters temporary operation before opening: site access and electrical configuration must be controlled for 1,500 workers.
Our approach
Lock-outs of substations, absence-of-voltage checks and third-rail earthing, train movement management from the control centre, line interventions, work-permit office, site configuration control and EHS training support.