Employee login
TRACTEDIS Contact us
Transport · France

Grand Paris Express: traction simulation of line 15 West

Traction power sizing of the western branch, between Pont de Sèvres and Bécon-les-Bruyères.

20 kmof automated metro
11stations
600,000daily trips
Horizon 2030Period

The assignment

Traction power sizing of the western branch, between Pont de Sèvres and Bécon-les-Bruyères.

The challenge

Line 15 West, 20 km underground, will form with lines 15 South and East a 75 km orbital around Paris, connecting with RER, Transilien, metro, tram and lines 14, 16 and 17.

Our approach

Line model in the SIGNON suite (ELBAS), simulation of degraded modes and interim services, analysis of line and rail-to-earth voltages, currents and RMS currents to set the minimum traction unit rating, including energy recovery and voltage regulation.

Project owner
Société des grands projets
Groupement
TRACTEDIS, Engie, TSO, Geste
TRACTEDIS role
Traction power simulation and sizing
Assignment
Design
System and voltage
1,500 V DC
Country
France
Period
Horizon 2030
Certificate
On request

A similar project? Let’s talk

A fast answer from the office closest to your project.

Discuss your project