Transport · France
Line 15 South: power systems of 4 ancillary structures
Power construction design of four ancillary structures between Villejuif and Sèvres.
51electrical diagrams
400 kVAsmoke extraction fans
2022–2024Period
The assignment
Power construction design of four ancillary structures between Villejuif and Sèvres.
The challenge
The 12 km section, fully underground, crosses dense urban areas and passes under the Seine.
Our approach
Power balance, LV and lighting calculations, cable book, general synoptic, panel diagrams and earthing principle, with interface meetings and site support.