Grand Paris Express, lines 16 and 17

Traction power simulation of Grand Paris Express lines 16 and 17 to determine the rating of the traction units.

12stations
10rectifier substations
2,000 Ain the return rail
5 MWper traction unit
2021–2027Period

The assignment

Traction power simulation of Grand Paris Express lines 16 and 17 to determine the rating of the traction units.

The challenge

Line 16, in the east of the metropolis, serves 10 stations, 8 of them interchanges: 29 km of automated metro for 200,000 daily passengers. It shares a section with line 17, which branches off at Le Bourget and runs to Le Mesnil-Amelot via Le Bourget and Charles de Gaulle airports.

Our approach

TRACTEDIS models both lines in the SIGNON suite (ELBAS): speed limits, gradients, curves, rolling stock, headways. Several scenarios are simulated, including degraded modes (loss of a traction unit) and interim services. The results (catenary and rail-to-earth voltages, currents, RMS currents of the units) give the critical values used to set the minimum traction unit rating.

Project owner
Société des grands projets
Engineer
Egis / Setec
Contractor
Equans
TRACTEDIS role
Traction power simulations
Assignment
Design
System and voltage
1,500 V DC
Country
France
Period
2021–2027
Certificate
On request