Grand Paris Express: traction substation testing, lines 16 and 17
Testing of the rectifier and sub-sectioning substations powering the two automated metro lines.
10rectifier substations
18sub-sectioning posts
55.5 kmof track
68.2 MVAinstalled
2023–2026Period
The assignment
Testing of the rectifier and sub-sectioning substations powering the two automated metro lines.
The challenge
Rectifier substations feed the overhead line and sub-sectioning posts split the lines into sections: each must be verified before service.
Our approach
Phase 2.1: visual checks, continuity and insulation of cables, HV switchgear and panels, earthing, interlocking. Phase 2.2: LV commissioning, MV protection tests, opening and closing times. Then HV commissioning tests.
- Project owner
- Société des grands projets
- Engineer
- Egis / Setec
- Contractor
- Equans
- Chargé d'essais
- TRACTEDIS
- TRACTEDIS role
- Procedures, test books and on-site testing (phases 2.1, 2.2 and HV commissioning)
- Assignment
- Testing & commissioning
- System and voltage
- 1,500 V DC / MV
- Country
- France
- Period
- 2023–2026
- Certificate
- On request