Three assignments at the EPTIC depot in Clichy for a new maintenance workshop.
The assignment
Three assignments at the EPTIC depot in Clichy for a new maintenance workshop.
The challenge
Building a new maintenance workshop at the EPTIC depot in Clichy requires renewing the track lighting, controlling a new 25 kV switch and securing existing networks during works.
Our approach
Flexible lighting gantries: tender documents in two contracts (source identification, cable routes, lighting and electrical calculations with Dialux and Caneco BT, specifications), then with SETEC Ferroviaire bid analysis, review of contractor studies, works supervision and pre-acceptance. 25 kV switch: relay-based control logic without a PLC, to simplify and cut costs, checked at approval, connection and testing. Emergency: isolation of the substation feeding the preconditioning sockets and remote cutting of HV cables found during excavation, after checking they were dead.
- Client
- SNCF, with SETEC Ferroviaire
- TRACTEDIS role
- Tender design, contract award assistance, works supervision, control-command, emergency intervention
- Assignment
- Design, Engineering & supervision
- System and voltage
- 25 kV / LV
- Country
- France
- Period
- 2022
- Certificate
- On request