EOLE: EALE substations and catenary in tunnel

Design and works supervision of the EALE substations and catenary in the RER E tunnel.

25catenary switches
8 kmof tunnel
5EALE substations
2016–2023Period

The assignment

Design and works supervision of the EALE substations and catenary in the RER E tunnel.

The challenge

The project extends RER E by 55 km westwards, including 8 km of tunnel between Haussmann–Saint-Lazare and Nanterre-La Folie, with three new stations.

Our approach

External review of the contractor's studies and test procedures: room layouts, HV and control panel diagrams, energisation test books, feeder pulling in tunnel; site supervision, meetings, interfaces and schedule.

Project owner
SNCF
Engineer
SED (Setec, Egis, Duthilleul)
Contractor
TSO Caténaires
TRACTEDIS role
External review of construction studies and works supervision
Assignment
Engineering & supervision
System and voltage
25 kV
Country
France
Period
2016–2023