EOLE: Mantes-la-Jolie depot

MV supply, distribution and lighting of the new RER E train depot.

€170mproject cost
13,000 m²of rail platform
24,000 m²of roads lit
2018–2024Period

The assignment

MV supply, distribution and lighting of the new RER E train depot.

The challenge

The depot includes a 6-track workshop, an underfloor wheel lathe, washing and waste areas, 4 stabling sidings and an interlocking.

Our approach

Temporary and permanent MV supply (4 MVA supply substation, internal 20 kV loop, 800 kVA HV/LV substation), full power distribution and outdoor lighting, coordinated with SNCF's building and energy agency.

Project owner
SNCF Réseau
Engineer
Setec / TRACTEDIS
Contractor
Spie Batignolles Énergie
TRACTEDIS role
Design and works supervision of the electrical package (detailed design to acceptance)
Assignment
Engineering & supervision
System and voltage
20 kV / LV
Country
France
Period
2018–2024