Electrification of the RATP Charlebourg bus depot
Electrification scenarios for a 211-bus depot, from the grid connection to the chargers.
211bus bays
3options studied
350 kWper fast charger
2024Period
The assignment
Electrification scenarios for a 211-bus depot, from the grid connection to the chargers.
The challenge
RATP plans to electrify its La Garenne-Colombes bus depot, which stables and maintains its road fleet.
Our approach
Three options studied (fast charging, light zonal electrification, slow charging with smart charging), power architecture for each, equipment from Enedis substations to chargers, charging modes (pantograph, mobile charger, wall socket) and backed-up supplies.