Grids & Industry · France
Busigny substation: earthing grid
Earthing study of a renewed railway substation: grid resistance and step and touch voltages.
< 5 Ωtarget grid resistance
2024–2025Period
The assignment
Earthing study of a renewed railway substation: grid resistance and step and touch voltages.
The challenge
The full substation renewal (LV room, HV/MV equipment, cable routes, earthing) requires proving a grid resistance below 5 Ω and safe step and touch voltages.
Our approach
Soil resistivity measurement by the Wenner method, earthing grid model, grid resistance calculation, step and touch voltage simulation with XGSLab, recommendations and post-works measurement.
- Project owner
- SNCF Réseau
- Engineer
- SNCF Réseau
- Contractor
- Colas Rail
- TRACTEDIS role
- Full earthing grid study
- Assignment
- Design
- System and voltage
- HTB / MV
- Country
- France
- Period
- 2024–2025
- Certificate
- On request