Employee login
TRACTEDIS Contact us
Grids & Industry · France

Busigny substation: earthing grid

Earthing study of a renewed railway substation: grid resistance and step and touch voltages.

< 5 Ωtarget grid resistance
2024–2025Period

The assignment

Earthing study of a renewed railway substation: grid resistance and step and touch voltages.

The challenge

The full substation renewal (LV room, HV/MV equipment, cable routes, earthing) requires proving a grid resistance below 5 Ω and safe step and touch voltages.

Our approach

Soil resistivity measurement by the Wenner method, earthing grid model, grid resistance calculation, step and touch voltage simulation with XGSLab, recommendations and post-works measurement.

Project owner
SNCF Réseau
Engineer
SNCF Réseau
Contractor
Colas Rail
TRACTEDIS role
Full earthing grid study
Assignment
Design
System and voltage
HTB / MV
Country
France
Period
2024–2025
Certificate
On request

A similar project? Let’s talk

A fast answer from the office closest to your project.

Discuss your project